until the switch-off deadline · that’s about 64 working days, with Christmas in the middle
Single lines on the main desk, reception, and that one in the warehouse.
ISDN2 and ISDN30 feeding an on-site PBX. These need a full replacement plan.
Intruder, fire and monitored alarms that dial out to a receiving centre.
Older PDQ terminals that take payments over a phone line.
Emergency lift phones and door entry that need a working line by law or by lease.
Broadband that rides on a copper phone line. It goes when the line goes.
Fax machines, franking machines and anything else with a phone cable in the back.
Normal. We'll pull your line records and tell you what each one does.
Number ports and engineer visits are already booking up across the industry. Businesses that start in the last few weeks risk a gap in service while they wait for a slot.
Hosted phone systems run on infrastructure we operate in the UK, with resilience built in.
Full fibre and SoGEA connectivity on our network, so voice and broadband come from one accountable team.
Over 100 CRM integrations, call recording, Teams calling and call analytics, configured for you.
Order, change and support your lines, users and numbers from one place, without juggling suppliers.
The same team can look after your IT, Microsoft 365 and cyber security when you're ready.
Hosted phone systems run on infrastructure we operate in the UK, with resilience built in.
No. We port your existing numbers across to your new service, so customers and suppliers keep calling the numbers they already have.
Lines still on the old network will stop working once it closes, along with anything that relies on them. Until then, legacy line rental keeps rising, and it has already roughly doubled since 2025.
Many do, but some older units can’t work over a digital line and need a replacement or a different connection. We test each one as part of the audit and tell you exactly what’s needed before you switch.
Not always. Some setups can be moved with adaptors. If your ISDN phone system is reaching end of life, we’ll show you the options, including a hosted system with Teams and CRM integration, and let you decide.
Most businesses are live within two working weeks of agreeing their plan. Multi-site moves are scheduled site by site to avoid any downtime.
Enter your details below to stay up to date with the latest updates from Rydal Group